Ararat Terminal Station

AEO designed, constructed, owns, and operates the Ararat Terminal Station, located 1.5 km north of the town of Elmhurst, Victoria.

The project was constructed in 2017 and enable the connection of 75 wind turbines, producing 242 MW of clean, renewable, and secure power for the national electricity grid.

In addition to the station, AEO also safely own and operate the 21 km of 132kV powerlines that link the wind farm to the station.